Skip to content

Class: CalculationPeriodDates

A data for: defining the parameters used to generate the calculation period dates schedule, including the specification of any initial or final stub calculation periods. A calculation period schedule consists of an optional initial stub calculation period, one or more regular calculation periods and an optional final stub calculation period. In the absence of any initial or final stub calculation periods, the regular part of the calculation period schedule is assumed to be between the effective date and the termination date. No implicit stubs are allowed, i.e. stubs must be explicitly specified using an appropriate combination of firstPeriodStartDate, firstRegularPeriodStartDate and lastRegularPeriodEndDate.

URI: common_domain_model:CalculationPeriodDates

 classDiagram
    class CalculationPeriodDates
    click CalculationPeriodDates href "../CalculationPeriodDates/"
      CalculationPeriodDates : calculationPeriodDatesAdjustments
        
          
    
        
        
        CalculationPeriodDates --> "0..1" BusinessDayAdjustments : calculationPeriodDatesAdjustments
        click BusinessDayAdjustments href "../BusinessDayAdjustments/"
    

        
      CalculationPeriodDates : calculationPeriodFrequency
        
          
    
        
        
        CalculationPeriodDates --> "0..1" CalculationPeriodFrequency : calculationPeriodFrequency
        click CalculationPeriodFrequency href "../CalculationPeriodFrequency/"
    

        
      CalculationPeriodDates : effectiveDate
        
          
    
        
        
        CalculationPeriodDates --> "0..1" AdjustableOrRelativeDate : effectiveDate
        click AdjustableOrRelativeDate href "../AdjustableOrRelativeDate/"
    

        
      CalculationPeriodDates : firstCompoundingPeriodEndDate
        
      CalculationPeriodDates : firstPeriodStartDate
        
          
    
        
        
        CalculationPeriodDates --> "0..1" AdjustableOrRelativeDate : firstPeriodStartDate
        click AdjustableOrRelativeDate href "../AdjustableOrRelativeDate/"
    

        
      CalculationPeriodDates : firstRegularPeriodStartDate
        
      CalculationPeriodDates : lastRegularPeriodEndDate
        
      CalculationPeriodDates : stubPeriodType
        
          
    
        
        
        CalculationPeriodDates --> "*" StubPeriodTypeEnum : stubPeriodType
        click StubPeriodTypeEnum href "../StubPeriodTypeEnum/"
    

        
      CalculationPeriodDates : terminationDate
        
          
    
        
        
        CalculationPeriodDates --> "0..1" AdjustableOrRelativeDate : terminationDate
        click AdjustableOrRelativeDate href "../AdjustableOrRelativeDate/"
    

        
      
Name Cardinality and Range Description Inheritance
effectiveDate 0..1
AdjustableOrRelativeDate
The first day of the terms of the trade direct
terminationDate 0..1
AdjustableOrRelativeDate
The last day of the terms of the trade direct
calculationPeriodDatesAdjustments 0..1
BusinessDayAdjustments
The specification of the business day convention and financial business cente… direct
firstPeriodStartDate 0..1
AdjustableOrRelativeDate
The start date of the calculation period direct
firstRegularPeriodStartDate 0..1
date
The start date of the regular part of the calculation period schedule direct
firstCompoundingPeriodEndDate 0..1
date
The end date of the initial compounding period when compounding is applicable direct
lastRegularPeriodEndDate 0..1
date
The end date of the regular part of the calculation period schedule direct
stubPeriodType *
StubPeriodTypeEnum
Method to allocate any irregular period remaining after regular periods have … direct
calculationPeriodFrequency 0..1
CalculationPeriodFrequency
The frequency at which calculation period end dates occur with the regular pa… direct
used by used in type used
DateRelativeToCalculationPeriodDates calculationPeriodDatesReference range CalculationPeriodDates
ObservationTerms calculationPeriodDates range CalculationPeriodDates
ResetDates calculationPeriodDatesReference range CalculationPeriodDates
StubCalculationPeriodAmount calculationPeriodDatesReference range CalculationPeriodDates
StubPeriod calculationPeriodDatesReference range CalculationPeriodDates
CommodityPayout calculationPeriodDates range CalculationPeriodDates
InterestRatePayout calculationPeriodDates range CalculationPeriodDates
  • Rosetta condition FpML_ird_16 is not stated in LinkML: if firstRegularPeriodStartDate exists then terminationDate -> adjustableDate -> unadjustedDate > firstRegularPeriodStartDate
  • Rosetta condition FpML_ird_17 is not stated in LinkML: if lastRegularPeriodEndDate exists then terminationDate -> adjustableDate -> unadjustedDate > lastRegularPeriodEndDate
  • Rosetta condition FpML_ird_18 is not stated in LinkML: if firstRegularPeriodStartDate exists and lastRegularPeriodEndDate exists then lastRegularPeriodEndDate > firstRegularPeriodStartDate
  • Rosetta condition FpML_ird_20 is not stated in LinkML: if lastRegularPeriodEndDate exists then lastRegularPeriodEndDate > effectiveDate -> adjustableDate -> unadjustedDate
  • Rosetta condition FpML_ird_21 is not stated in LinkML: if firstPeriodStartDate exists and effectiveDate exists then firstPeriodStartDate -> adjustableDate -> unadjustedDate < effectiveDate -> adjustableDate -> unadjustedDate
  • Rosetta condition FpML_ird_22 is not stated in LinkML: if firstPeriodStartDate exists and firstRegularPeriodStartDate exists then firstPeriodStartDate -> adjustableDate -> unadjustedDate < firstRegularPeriodStartDate
property value
rosetta_metadata key
Mapping Type Mapped Value
self common_domain_model:CalculationPeriodDates
native common_domain_model:CalculationPeriodDates
name: CalculationPeriodDates
annotations:
rosetta_metadata:
tag: rosetta_metadata
value: key
description: 'A data for: defining the parameters used to generate the calculation
period dates schedule, including the specification of any initial or final stub
calculation periods. A calculation period schedule consists of an optional initial
stub calculation period, one or more regular calculation periods and an optional
final stub calculation period. In the absence of any initial or final stub calculation
periods, the regular part of the calculation period schedule is assumed to be between
the effective date and the termination date. No implicit stubs are allowed, i.e.
stubs must be explicitly specified using an appropriate combination of firstPeriodStartDate,
firstRegularPeriodStartDate and lastRegularPeriodEndDate.'
comments:
- 'Rosetta condition FpML_ird_16 is not stated in LinkML: if firstRegularPeriodStartDate
exists then terminationDate -> adjustableDate -> unadjustedDate > firstRegularPeriodStartDate'
- 'Rosetta condition FpML_ird_17 is not stated in LinkML: if lastRegularPeriodEndDate
exists then terminationDate -> adjustableDate -> unadjustedDate > lastRegularPeriodEndDate'
- 'Rosetta condition FpML_ird_18 is not stated in LinkML: if firstRegularPeriodStartDate
exists and lastRegularPeriodEndDate exists then lastRegularPeriodEndDate > firstRegularPeriodStartDate'
- 'Rosetta condition FpML_ird_20 is not stated in LinkML: if lastRegularPeriodEndDate
exists then lastRegularPeriodEndDate > effectiveDate -> adjustableDate -> unadjustedDate'
- 'Rosetta condition FpML_ird_21 is not stated in LinkML: if firstPeriodStartDate
exists and effectiveDate exists then firstPeriodStartDate -> adjustableDate -> unadjustedDate
< effectiveDate -> adjustableDate -> unadjustedDate'
- 'Rosetta condition FpML_ird_22 is not stated in LinkML: if firstPeriodStartDate
exists and firstRegularPeriodStartDate exists then firstPeriodStartDate -> adjustableDate
-> unadjustedDate < firstRegularPeriodStartDate'
from_schema: https://w3id.org/lmodel/common-domain-model
attributes:
effectiveDate:
name: effectiveDate
description: The first day of the terms of the trade. This day may be subject
to adjustment in accordance with a business day convention.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
domain_of:
- CodeValue
- AgreementEventInstruction
- ClosedState
- CounterpartyPositionBusinessEvent
- IndexTransitionInstruction
- StockSplitInstruction
- PriceQuantity
- FallbackRateParameters
- CalculationPeriodDates
- LegalAgreementBase
- EventInstruction
- MinimumTransferAmountAmendment
- TerminationCurrencyAmendment
- CancelableProvision
- EconomicTerms
range: AdjustableOrRelativeDate
terminationDate:
name: terminationDate
description: The last day of the terms of the trade. This date may be subject
to adjustments in accordance with the business day convention. It can also be
specified in relation to another scheduled date (e.g. the last payment date).
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
domain_of:
- CalculationPeriodDates
- EconomicTerms
range: AdjustableOrRelativeDate
calculationPeriodDatesAdjustments:
name: calculationPeriodDatesAdjustments
description: The specification of the business day convention and financial business
centers used for adjusting any calculation period date if it would otherwise
fall on a day that is not a business day in the specified business center.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
domain_of:
- CalculationPeriodDates
range: BusinessDayAdjustments
firstPeriodStartDate:
name: firstPeriodStartDate
description: The start date of the calculation period. FpML specifies that for
interest rate swaps this date must only be specified if it is not equal to the
effective date. It is always specified in the case of equity swaps and credit
default swaps with periodic payments. This date may be subject to adjustment
in accordance with a business day convention.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
domain_of:
- CalculationPeriodDates
range: AdjustableOrRelativeDate
firstRegularPeriodStartDate:
name: firstRegularPeriodStartDate
description: The start date of the regular part of the calculation period schedule.
It must only be specified if there is an initial stub calculation period. This
day may be subject to adjustment in accordance with any adjustments specified
in calculationPeriodDatesAdjustments.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
domain_of:
- CalculationPeriodDates
range: date
firstCompoundingPeriodEndDate:
name: firstCompoundingPeriodEndDate
description: The end date of the initial compounding period when compounding is
applicable. It must only be specified when the compoundingMethod element is
present and not equal to a value of None. This date may be subject to adjustment
in accordance with any adjustments specified in calculationPeriodDatesAdjustments.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
domain_of:
- CalculationPeriodDates
range: date
lastRegularPeriodEndDate:
name: lastRegularPeriodEndDate
description: The end date of the regular part of the calculation period schedule.
It must only be specified if there is a final stub calculation period. This
day may be subject to adjustment in accordance with any adjustments specified
in calculationPeriodDatesAdjustments.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
domain_of:
- CalculationPeriodDates
range: date
stubPeriodType:
name: stubPeriodType
description: Method to allocate any irregular period remaining after regular periods
have been allocated between the effective and termination date. The multiplicity
of 2 allows the possibility of expressing the type for both an initial and final
stub at the same time.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
domain_of:
- CalculationPeriodDates
range: StubPeriodTypeEnum
multivalued: true
maximum_cardinality: 2
calculationPeriodFrequency:
name: calculationPeriodFrequency
description: The frequency at which calculation period end dates occur with the
regular part of the calculation period schedule and their roll date convention.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
domain_of:
- CalculationPeriodDates
range: CalculationPeriodFrequency
name: CalculationPeriodDates
annotations:
rosetta_metadata:
tag: rosetta_metadata
value: key
description: 'A data for: defining the parameters used to generate the calculation
period dates schedule, including the specification of any initial or final stub
calculation periods. A calculation period schedule consists of an optional initial
stub calculation period, one or more regular calculation periods and an optional
final stub calculation period. In the absence of any initial or final stub calculation
periods, the regular part of the calculation period schedule is assumed to be between
the effective date and the termination date. No implicit stubs are allowed, i.e.
stubs must be explicitly specified using an appropriate combination of firstPeriodStartDate,
firstRegularPeriodStartDate and lastRegularPeriodEndDate.'
comments:
- 'Rosetta condition FpML_ird_16 is not stated in LinkML: if firstRegularPeriodStartDate
exists then terminationDate -> adjustableDate -> unadjustedDate > firstRegularPeriodStartDate'
- 'Rosetta condition FpML_ird_17 is not stated in LinkML: if lastRegularPeriodEndDate
exists then terminationDate -> adjustableDate -> unadjustedDate > lastRegularPeriodEndDate'
- 'Rosetta condition FpML_ird_18 is not stated in LinkML: if firstRegularPeriodStartDate
exists and lastRegularPeriodEndDate exists then lastRegularPeriodEndDate > firstRegularPeriodStartDate'
- 'Rosetta condition FpML_ird_20 is not stated in LinkML: if lastRegularPeriodEndDate
exists then lastRegularPeriodEndDate > effectiveDate -> adjustableDate -> unadjustedDate'
- 'Rosetta condition FpML_ird_21 is not stated in LinkML: if firstPeriodStartDate
exists and effectiveDate exists then firstPeriodStartDate -> adjustableDate -> unadjustedDate
< effectiveDate -> adjustableDate -> unadjustedDate'
- 'Rosetta condition FpML_ird_22 is not stated in LinkML: if firstPeriodStartDate
exists and firstRegularPeriodStartDate exists then firstPeriodStartDate -> adjustableDate
-> unadjustedDate < firstRegularPeriodStartDate'
from_schema: https://w3id.org/lmodel/common-domain-model
attributes:
effectiveDate:
name: effectiveDate
description: The first day of the terms of the trade. This day may be subject
to adjustment in accordance with a business day convention.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
owner: CalculationPeriodDates
domain_of:
- CodeValue
- AgreementEventInstruction
- ClosedState
- CounterpartyPositionBusinessEvent
- IndexTransitionInstruction
- StockSplitInstruction
- PriceQuantity
- FallbackRateParameters
- CalculationPeriodDates
- LegalAgreementBase
- EventInstruction
- MinimumTransferAmountAmendment
- TerminationCurrencyAmendment
- CancelableProvision
- EconomicTerms
range: AdjustableOrRelativeDate
terminationDate:
name: terminationDate
description: The last day of the terms of the trade. This date may be subject
to adjustments in accordance with the business day convention. It can also be
specified in relation to another scheduled date (e.g. the last payment date).
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
owner: CalculationPeriodDates
domain_of:
- CalculationPeriodDates
- EconomicTerms
range: AdjustableOrRelativeDate
calculationPeriodDatesAdjustments:
name: calculationPeriodDatesAdjustments
description: The specification of the business day convention and financial business
centers used for adjusting any calculation period date if it would otherwise
fall on a day that is not a business day in the specified business center.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
owner: CalculationPeriodDates
domain_of:
- CalculationPeriodDates
range: BusinessDayAdjustments
firstPeriodStartDate:
name: firstPeriodStartDate
description: The start date of the calculation period. FpML specifies that for
interest rate swaps this date must only be specified if it is not equal to the
effective date. It is always specified in the case of equity swaps and credit
default swaps with periodic payments. This date may be subject to adjustment
in accordance with a business day convention.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
owner: CalculationPeriodDates
domain_of:
- CalculationPeriodDates
range: AdjustableOrRelativeDate
firstRegularPeriodStartDate:
name: firstRegularPeriodStartDate
description: The start date of the regular part of the calculation period schedule.
It must only be specified if there is an initial stub calculation period. This
day may be subject to adjustment in accordance with any adjustments specified
in calculationPeriodDatesAdjustments.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
owner: CalculationPeriodDates
domain_of:
- CalculationPeriodDates
range: date
firstCompoundingPeriodEndDate:
name: firstCompoundingPeriodEndDate
description: The end date of the initial compounding period when compounding is
applicable. It must only be specified when the compoundingMethod element is
present and not equal to a value of None. This date may be subject to adjustment
in accordance with any adjustments specified in calculationPeriodDatesAdjustments.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
owner: CalculationPeriodDates
domain_of:
- CalculationPeriodDates
range: date
lastRegularPeriodEndDate:
name: lastRegularPeriodEndDate
description: The end date of the regular part of the calculation period schedule.
It must only be specified if there is a final stub calculation period. This
day may be subject to adjustment in accordance with any adjustments specified
in calculationPeriodDatesAdjustments.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
owner: CalculationPeriodDates
domain_of:
- CalculationPeriodDates
range: date
stubPeriodType:
name: stubPeriodType
description: Method to allocate any irregular period remaining after regular periods
have been allocated between the effective and termination date. The multiplicity
of 2 allows the possibility of expressing the type for both an initial and final
stub at the same time.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
owner: CalculationPeriodDates
domain_of:
- CalculationPeriodDates
range: StubPeriodTypeEnum
multivalued: true
maximum_cardinality: 2
calculationPeriodFrequency:
name: calculationPeriodFrequency
description: The frequency at which calculation period end dates occur with the
regular part of the calculation period schedule and their roll date convention.
from_schema: https://w3id.org/lmodel/common-domain-model/cdm_product_common_schedule
rank: 1000
owner: CalculationPeriodDates
domain_of:
- CalculationPeriodDates
range: CalculationPeriodFrequency