Enum: StubPeriodTypeEnum
The enumerated values to specify how to deal with a non standard calculation period within a swap stream.
URI: common_domain_model:StubPeriodTypeEnum
Permissible Values
Section titled “Permissible Values”| Value | Meaning | Description |
|---|---|---|
| ShortInitial | None | If there is a non regular period remaining it is left shorter than the stream… |
| ShortFinal | None | If there is a non regular period remaining it is left shorter than the stream… |
| LongInitial | None | If there is a non regular period remaining it is placed at the start of the s… |
| LongFinal | None | If there is a non regular period remaining it is placed at the end of the str… |
| Name | Description |
|---|---|
| stubPeriodType | Method to allocate any irregular period remaining after regular periods have … |
Identifier and Mapping Information
Section titled “Identifier and Mapping Information”Schema Source
Section titled “Schema Source”- from schema: https://w3id.org/lmodel/common-domain-model
LinkML Source
Section titled “LinkML Source”name: StubPeriodTypeEnumdescription: The enumerated values to specify how to deal with a non standard calculation period within a swap stream.from_schema: https://w3id.org/lmodel/common-domain-modelrank: 1000permissible_values: ShortInitial: text: ShortInitial description: If there is a non regular period remaining it is left shorter than the streams calculation period frequency and placed at the start of the stream. ShortFinal: text: ShortFinal description: If there is a non regular period remaining it is left shorter than the streams calculation period frequency and placed at the end of the stream. LongInitial: text: LongInitial description: If there is a non regular period remaining it is placed at the start of the stream and combined with the adjacent calculation period to give a long first calculation period. LongFinal: text: LongFinal description: If there is a non regular period remaining it is placed at the end of the stream and combined with the adjacent calculation period to give a long last calculation period.